Press "Enter" to skip to content

ZOLENGTHE Connecting the Zo People

By Admin

The dam was originally designed to contain flood waters in the lower Barak valley but hydro power generation was later incorporated into the project. The project will have an installation capacity of 1500 MW and a firm generation of 412 …

Links to more information:

Comments are closed.