Press "Enter" to skip to content

ACWA Power Commissions Second Phase Of Dubai Solar Project Adding 200 Megawatts

The solar power park will have an eventual capacity of 5 gigawatts. The initial planned capacity was 1 gigawatt, which was subsequently increased to …

Links to article:

Be First to Comment

Leave a Reply